Friday, 1 April 2016

The Kitchen Progress

So remember that post way back in the fall when I posted a picture of a kitchen reno in progress? Well here's a little before and after of that project.

The kitchen side one, when we moved into the house

The Kitchen side one, all finished!
Stuff we did:

  • New Brazilian cherry hardwood floor to match the rest of the house went in just before we moved into the house.
  • Joel installed the new Kenmore Elite convection double ovens to replace the 1963 Chambers double ovens. 
  • The hardwood drawer fronts and cupboard doors were sanded down, primed and painted with a paint sprayer (about 5-6 coats)
  • The whole frame around the cupboards had to be rebuilt to hold the new butcher block
  • The butcher block was custom made here in Marin and installed (it weighs a ton!)
  • Oiled bronze pulls were ordered from Lee Valley - gotta support our favourite Canadian hardware!
  • Benjamin Moore chalkboard paint in that deep warm grey was used on flat areas around the back of the kitchen island and up the side of the oven cupboard area. 

No comments:

Post a Comment